Working Platforms

“ One third of accidents in the piling industry result from defects in the working platform” – (Terry Bolsher Chairman of the UK Federation of Piling Specialists).

The experience in Australia is not dissimilar to the UK. Ground supported working platforms are critical for heavy equipment stability, and modern piling equipment is becoming heavier with higher centres of gravity to cater for the ever increasing market for deeper foundations. Every incident occurring and every “near miss” involving unsafe working platforms is a potential fatality.

The responsibility for the design, construction, maintenance and repair of a working platform should be taken by the organisation that has continuous control of ALL of the project activities – NOT the piling contractor. The platform may continue to exist after the piling contractor leaves the site and may be used by following trades, so maintenance and repair may need to continue beyond the end of the piling works. Even during the piling works the platform may be used by other trades.

Members of the Piling & Foundation Specialists Federation (PFSF) in Australia have therefore instigated a drive to follow the lead set by the UK based Federation just over 4 years ago. They introduced a Working Platform Certificate (WPC) which is now in extensive use in the UK and has proven to be a highly effective way of overcoming the problems that existed prior to its introduction. Reported incidents have decreased significantly.

The WPC confirms that the working platform has been properly designed, constructed in accordance with the design, and will be adequately maintained to ensure that the integrity of the platform is likewise maintained. The WPC requires the signature of the Principal Contractor and must be handed to the Piling Contractor before piling or other foundation work commences on site. The use of the WPC is a way of increasing the awareness of working platform safety and the importance of maintaining the platform in good condition throughout the course of the contract.

  • Working Platform Certificate (WPC) developed for Australian use.- Working Platform Certificate (WPC) developed for Australian use.
  • The FPS in the UK in conjunction with the Building Research Establishment (BRE) have produced a good practice guide to the design, installation, maintenance and repair of ground supported working platforms. BR470 ISBN 1 86081 7009
  • “Working Platforms for tracked plant”.
  • The BRE design method for calculating the thickness of the working platform requires the use of realistic parameters for the properties of both the platform material and the underlying stratum. A paper discussing the relationship between the platform thickness to the choice of parameters is available – “Working Platform Design Sensitivity”.
  • Track bearing pressures calculated for use in the BRE design method are commonly much higher than given by a simple calculation of the total weight divided by the total track area. Calculation of the track bearing pressures in an appropriate manner consistent with the BRE design method is a fundamental requirement of its use and the use of bearing pressures calculated by any other means could potentially lead to an unsafe working platform design. Guidance on how to calculate pressures for the BRE design method can be found in the paper “Calculation of Track Bearing Pressures for Platform Design” and the “Rig Loading Spreadsheet”.
  • Another important document worth noting is Guide to hydraulically bound working platforms.
  • The colour poster attached, graphically demonstrates the importance of a safe Working Platform and raises awareness to all workers onsite. Poster can be placed on site notice boards.  PDF link below.
  • Frequently Asked Questions – a summary sheet listing frequently asked questions regarding the Working Platform initiative has been prepared for use by Principal and Piling Contractors for discussion at the tender stage of a project.  PDF link below.

The Federation is receiving full support from the FPS in the UK for this most important initiative and wishes to acknowledge our thanks and appreciation for the detailed work that they have already undertaken. We trust that principal contractors in Australia will likewise support the initiative and circulate details of the proposals to their Estimating staff, and their design and project personnel throughout the country.

For further information on rig loading spreadsheets please go to www.fps.org.uk and seek speacialist advice from your Australian Piling Contractor before implementing this document.

Working Platform Certificate

Working Platform colour poster.PDF

Frequently Asked Questions

Latest News

PFSF-DFI Melbourne Conference

PFSF-DFI Melbourne Conference This inaugeral joint conference between the Piling and Foundation Specialist Federation (PFSF) and the Deep Foundations Institute (DFI) covers piling [...]

March 1st, 2017|

The Introduction of PileSafe

The Introduction of PileSafe The Piling and Foundation Specialists Federation (PFSF) and The Crane Industry Council of Australia (CICA) have formed an industry [...]

April 1st, 2016|