Project Description
LTE Construction Group Pty Ltd
Tel: 03 9748 3646
Email: info@lteconstructiongroup.com.au
Website: lteconstructiongroup.com.au
Location:
25 Elm Park Drive
Hoppers Crossing
VIC 3329
This company offers the following Geotechnical Engineering Techniques:
PRIMARY PROVIDER
The Member provides the technique using their own plant, personnel etc.
BORED PILES
Bored piles 300mm to 2100mm diameter
Drill to depths of up to 40 metres
CFA PILING
Rigs able to drill 35.0 metres without breaking auger
Diameters 450mm to 1200mm
RETAINING WALLS
Secant pile walls
Soldier pile walls with shotcrete infill
Temporary ground anchors
Capping beam concrete
In ground concrete works including pad footings/pile caps/rafts and slab on ground
D&C retention systems
OTHER SYSTEMS
Full basement construction including design and certification:
– piling
– capping beam/shotcrete walls
– temporary anchors
– bulk and detailed excavation
– concrete works